Bridge for All

Research

2017-

The conception of Bridge for All is what kickstarted Sendai in Progress. Numerous exchange events about the production of an artwork with the functions of a bridge, together with workshops to conceptualize the bridge were held, and many models produced. The construction of the bridge that is the basis of this work has met with various legal, budgetary, and other challenges, and discussions with Sendai City are still in progress. 

Bridge for All Research

LITERATURE

SEE MORE LITERATURES

2023

Idohama Pergola, Table, Bench

2022

Floating Bridge(temporary)

2022

Shinhama Tower

2020

Wood Path for All 2020

2019

Wood Path for All 2019

2018

Boat for All

2017-

Bridge for All

( Research )

Related Project2021 -

Production in Satohama

2030

Project Completion

2022 

2022.02.01
Remotely directed production of Shinhama Tower (until March 31st) @ Teizan Canal
2022.04.01
Establishment of Coastal Areas Revitalization Planning Office
2022.02.17
Sendai In Progress Report Exhibition @ smt (until July 31st)

2021 

2021.07
Establishment of Ido Town Development Promotion Committee
2021.11.20
Walking Tour of Small Buildings event (until Nov. 21st) held regularly hereafter
SEE MORE TIMELINE
Glossary